The AI Operating System for
Product Managers.

What changed. What conflicts. What needs a decision.
Caught, connected, and waiting for your call.

Enterprise-grade security. No model training on your data.

How Vantage works

Stay on top. Act on signals. Build from one place.

From chasing updates across five tools to making the calls that move products forward.

Slack
GitHub
Amplitude
Linear
Figma
Jira
One workspace

Keep your tools. Add intelligence.

Connect in 2 minutes. When something changes in one tool, every affected project knows.

Why did conversion drop?
AmplitudeGitHubSlack

Payment drop-off up 34% after Stripe SDK update. Mobile accounts for 78% of regression.

3 sources8 seconds

Every morning, know what matters.

Cross-product conflicts, dependency changes, open decisions. Caught and waiting for your call.

PR

PRD

4 requirements generated

R1-R4
TI

Tickets

3 synced to Linear

T1-T3
PR

Prototype

2 variants, shareable link

A / B

Brainstorm, spec, prototype, ship.

Specs, prototypes, tickets, compliance. All grounded in your actual project data.

The daily surface

Your morning briefing. Before standup.

Vantage watches your projects overnight. By 9am, you know what changed, what conflicts, and what needs your decision. Without checking anything manually.

☀️

Good morning, Alex

3 things need your attention this morning

HIGHAcross workspaces

Auth flow conflict: Project X vs Project Y

R4 assumes password auth. R2 mandates SSO. Detected from published requirements.

View conflictAcknowledge
HIGHCheckout Redesign

Prototype is stale

Requirements R3 and R7 changed yesterday. Prototype was generated before these changes.

Review changesDismiss
MEDIUMMobile App v2

GDPR compliance gap in requirement R12

Personal data processing without consent mechanism. Flagged during last document publish.

View detailsAcknowledge

“Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.”

Om Pancholi, Product, The Sleep Company
When reality changes

Context shifts. Everything rebuilds.

Like a code review for product decisions. Add new context, review the diff, commit. Nothing updates silently.

New context added

Engineering just estimated Apple Pay at 3 sprints. Your PM adds the Slack thread as context and hits Re-index.

Vantage shows you what changed

2 requirements updated · 5 artifacts impacted

R2Slack · eng estimate

Add Apple Pay as primary payment method

Deprioritize Apple Pay (~3 sprints). Keep existing methods. Revisit Q3.

R5GitHub · v7.2 changelog

Support Stripe SDK v6 and v7 simultaneously

Migrate fully to Stripe v7. Drop v6 support. Breaking change in v7.2.

PRD §3, §4 updatedLIN-203 removedLIN-208 addedPrototype flaggedCompliance re-checked

5 changes accepted · Rebuilt in 4.2 seconds

PRD, tickets, and prototype updated. Linear synced.

📄

PRD v3

2 sections rewritten

🎫

Tickets

1 removed, 1 added

🎨

Prototype

Variant B flagged

🛡

Compliance

PCI-DSS re-checked

Nothing goes stale.

“I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.”

Tarak Sawant, Product, Quantiphi
Integrations

Your tools, connected.

One workspace. No tab switching.

Slack

Decisions & threads

GitHub

Code & patterns

Amplitude

Product analytics

Figma

Design context

Linear

2-way ticket sync

Jira

2-way ticket sync

Notion

Docs & wikis

Google Workspace

Docs, Sheets, GA

Slack

Decisions & threads

GitHub

Code & patterns

Amplitude

Product analytics

Figma

Design context

Linear

2-way ticket sync

Jira

2-way ticket sync

Notion

Docs & wikis

Google Workspace

Docs, Sheets, GA

Slack

Decisions & threads

GitHub

Code & patterns

Amplitude

Product analytics

Figma

Design context

Linear

2-way ticket sync

Jira

2-way ticket sync

Notion

Docs & wikis

Google Workspace

Docs, Sheets, GA

Keep your tools. Add intelligence. Vantage doesn't replace Notion, Linear, or Slack — it connects them.

+ Google Analytics, Intercom, Datadog, PDFs, URLs, and more

Compounding intelligence

It gets smarter the longer you use it.

No setup. No configuration. Every action builds memory. Every project compounds into the next.

Learning from 3 projects
📄Spec format
PRD v2 template
🎫Ticket style
User story + AC
⚙️Stack
React · Node · Stripe
🔺Priority
P0 ships first

Learns how your team works.

Picks up your spec format, ticket style, tech stack, and past decisions. By the third project, it already knows your patterns. No templates. No configuration.

N
New PM generates first PRD
Matches team standards
Spec formatStack contextPast decisions

No ramp-up. No “ask Sarah.”

New joiners ship from day one.

A new PM signs in and generates artifacts that match team standards immediately. The institutional memory stays even when people leave.

Why did we deprioritize SSO?

SSO was deprioritized in Q3 after customer data showed 89% of churned accounts cited billing UX, not access control.

Q3 Planning PRD, Section 4.2
Amplitude: Churn Cohort Analysis
Slack: #product-strategy, Jun 12
3 sources4 seconds

Ask anything. Get a cited answer.

Cited answers in seconds, pulled from your specs, data from any connected tool, and the decision history behind it all. No digging through Slack. No pinging three people who might remember.

From our founding users

What PMs are saying.

I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.

Saved ~10 hrs/week

TS

Tarak Sawant

Product · Quantiphi

Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.

Compliance gaps caught pre-build

K

Khushboo

Product · Dhan · Fintech

Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.

Cross-project conflicts caught early

OP

Om Pancholi

Product · The Sleep Company

The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.

PRD quality validated

N

Nikhil

Product · India Today

I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.

Saved ~10 hrs/week

TS

Tarak Sawant

Product · Quantiphi

Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.

Compliance gaps caught pre-build

K

Khushboo

Product · Dhan · Fintech

Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.

Cross-project conflicts caught early

OP

Om Pancholi

Product · The Sleep Company

The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.

PRD quality validated

N

Nikhil

Product · India Today

Built for trust.

Enterprise-grade security so you can connect your tools with confidence.

Encrypted in transit

All connections use TLS. Your data is encrypted between your browser, our servers, and our database. Every action is logged.

No model training

We never train on your data. The AI services that process your data are contractually barred from training on it.

Your data, your control

Disconnect any integration or close your account at any time. We remove it from active systems within 30 days.

Pursuing SOC 2 Type II and GDPR compliance. Enterprise security reviews available on request.

Pricing

Start free. Upgrade when you need more.

The alternative

Hire a junior PM

$85,000 /year

  • -Handles 1 project at a time
  • -2-week ramp-up per project
  • -Manual research across 6+ tools
  • -Documents go stale after scope changes
  • -No compliance checks

Vantage Business

$59/seat/month

Everything a PM needs. No per-project limits.

  • Unlimited projects
  • 2-minute setup
  • Sourced answers in 30 seconds
  • Auto-rebuilds on context change
  • Compliance + conflict detection
  • Cross-project institutional memory
Save 20%
Free

$0

Try the full workflow. No credit card.

Start Free
  • 1 active project
  • 20 queries · 15 edits / mo
  • 3 documents · 2 prototypes · 2 journeys
  • Ticket generation
  • URL + text context
Most popular
Pro

$19/seat/mo

For PMs who ship weekly.

Get Pro
  • 3 active projects
  • 150 queries · 100 edits / mo
  • 10 documents · 8 prototypes · 15 journeys / mo
  • All connectors + Linear sync
  • Unlimited ticket batches & grooming
  • 2 viewer seats included
Business

$59/seat/mo

For teams running on Vantage daily.

Get Business
  • Everything in Pro, unlimited
  • Shared team workspace
  • Cross-project conflict detection
  • Realtime metrics tracking
  • 5 viewer seats included
Enterprise

Custom

For organizations with specific needs.

Talk to founders
  • Everything in Business
  • Multiple organizations
  • SSO (Google Workspace / SAML)
  • Audit log access
  • Dedicated support + SLA

No Credit Card Required. Start Free.

FAQ

Frequently asked questions

Stop being the sync layer.

Connect your tools. See what you've been missing by tomorrow morning.