The AI-native PM workspace.
Your product’s context is scattered across six tools.
Slack threads, PRs, funnel alerts, stale docs and design comments, each in a different place.
Keep Linear, Notion and Slack. Your team doesn’t have to change a thing.
Rollback Stripe SDK?
Conversion ↓ 12%
Payment refactor
3 weeks stale
Blocked by API team
3 comments
CHK-91 → next sprint
Where is the spec?
D7 retention ↓ 8%
Your Monday morning.
Used by product teams at
The bigger picture · 90 seconds
One decision changes.
Keep the whole product aligned.
Ten minutes to standup. A changed plan. See how Vantage carries the decision through your PRD, prototype and tickets. Then imagine that clarity across ten products.
Find your Vantage pointThe whole product loop. One place. Always in sync.
From the first customer signal to what shipped and what you learned. Every stage reads from the same context, so a change in one updates the rest.
Context
Six stages, one shared context.
Hear every customer. Know what matters.
Feedback from Slack, email, your feedback form and call transcripts lands in one inbox, sorted into themes and scored so you know what to build next.
Intake from where feedback already lives
Slack, email, a web form, plus Zoom, Meet, Gong and Fireflies transcripts.
Scored your way
RICE, WSJF, ICE or MoSCoW. Missing inputs show as “not set”, never guessed.
Ask why
Priority Chat explains any ranking with the evidence behind it.
Feedback inbox
auto-triagedSlack · #support
“Can we pay with Apple Pay yet?”
Gong · Acme renewal call
“Typing card details on mobile is painful.”
Email · Northwind
“Export to CSV keeps timing out.”
Feedback form
“Love the new dashboard.”
Priority Chat
Why is mobile checkout #1? Highest reach: a 12% conversion drop plus 3 customers asking. Effort is medium.
See what your customers are really telling you.
Paste a meeting transcript, support thread, or customer feedback.
Vantage extracts every signal and shows you what to build next.
PRDs, prototypes and journeys from real context.
One context produces all three, and every requirement links back to the quote, call or metric behind it.
PRDs your engineers trust
Grounded in your docs, signals and past decisions, with citations on every requirement.
Prototypes and user journeys
A clickable prototype and the journey it changes, generated from the same spec.
Ask your codebase
Connect GitHub and ask how things work today, before you write the spec.
“The generated PRD is one of the best I’ve seen in the business. Crisp, not too long, to the point.”
Tickets in the right order. A roadmap that stays honest.
Requirements become dependency-ordered tickets in Linear, and the roadmap shows real health instead of hopeful colors.
Dependency-ordered tickets
Waves that show eng what blocks what. Push to Linear with two-way sync you approve.
Roadmap with real health
Each project shows on track, conflicting or stale, computed from what’s actually happening.
Public roadmap, portal and changelog
Share what’s planned and what shipped, straight from the work.
Roadmap · Q4
health from live signalsContext shifts. Everything updates. You stay on top.
This is what your stack can’t do. When a decision changes anywhere, Vantage finds every artifact it touches, shows you the diff, and briefs you every morning on what needs your call.
When context changes
Every morning
Conflicts across projects
Two specs that contradict each other surface at the requirements stage, not in code review.
Nothing goes stale silently
A changed requirement flags the prototype, journey and tickets it affects.
One reviewed diff
Like a code review for product decisions. Review, accept, done.
“I spent half my week keeping docs, tickets and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit.”
Vantage keeps watching when you don’t.
Set up routines that run on a schedule or when something happens, and use your product context from the AI tools you already work in.
Scheduled or event-driven
Run a check every morning, or whenever an issue is reopened or a doc changes.
Results where you work
Routines post their findings to Slack or email, with sources attached.
Your context in Claude
Connect Vantage’s MCP server or use an API key, and ask about your projects from anywhere.
Routine · Morning spec check
ActiveEvery weekday · 8:00
or when a Linear issue is reopened
Scan PRDs for stale requirements
across all 4 projects
Summarise what changed overnight
with sources
Post to #product in Slack
3 items need a decision
Vantage inside Claude
MCPCompounding intelligence
It gets smarter the longer you use it.
No setup. No configuration. Every action builds memory. Every project compounds into the next.
Learns how your team works.
Picks up your spec format, ticket style, tech stack, and past decisions. By the third project, it already knows your patterns. No templates. No configuration.
No ramp-up. No “ask Sarah.”
New joiners ship from day one.
A new PM signs in and generates artifacts that match team standards immediately. The institutional memory stays even when people leave.
SSO was deprioritized in Q3 after customer data showed 89% of churned accounts cited billing UX, not access control.
Ask anything. Get a cited answer.
Cited answers in seconds, pulled from your specs, data from any connected tool, and the decision history behind it all. No digging through Slack. No pinging three people who might remember.
Start on your own. Bring your team when you’re ready.
Vantage works for one PM on day one. When teammates join, everyone works from the same context, and conflicts between teams surface early.
Shared workspace, private drafts
Published PRDs are visible to the team. Drafts stay invite-only until you publish.
Roles that fit how you work
Admin, editor and viewer, with per-workspace overrides.
Conflicts across teams
When your spec collides with another team’s, Vantage flags it before anyone builds.
Workspace · Payments team
Checkout redesign
Priya · PM
Mobile app v2
Arjun · PM
Pricing experiment
You
Mobile app v2 assumes guest checkout. Checkout redesign R3 requires sign-in for saved cards.
Caught at the requirements stage, before either team writes code.
Your tools, connected.
One workspace. No tab switching.
Linear
2-way ticket sync
Jira
2-way ticket sync
Azure DevOps
Work item sync
Asana
Project & tasks
GitHub
Code & patterns
Figma
Design context
Salesforce
Accounts & deals
HubSpot
CRM & tickets
Zendesk
Support tickets
Intercom
Customer data
Amplitude
Product analytics
PostHog
Analytics & flags
Mixpanel
Funnels & cohorts
Gong
Call transcripts
Granola
Meeting notes
Canny
Feature voting
Productboard
Feature requests
Notion
Docs & wikis
Confluence
Wiki & docs
Slack
Decisions & threads
Google Workspace
Docs, Sheets, GA
Datadog
Metrics & alerts
Sentry
Error tracking
PagerDuty
Incidents
LaunchDarkly
Feature flags
Linear
2-way ticket sync
Jira
2-way ticket sync
Azure DevOps
Work item sync
Asana
Project & tasks
GitHub
Code & patterns
Figma
Design context
Salesforce
Accounts & deals
HubSpot
CRM & tickets
Zendesk
Support tickets
Intercom
Customer data
Amplitude
Product analytics
PostHog
Analytics & flags
Mixpanel
Funnels & cohorts
Gong
Call transcripts
Granola
Meeting notes
Canny
Feature voting
Productboard
Feature requests
Notion
Docs & wikis
Confluence
Wiki & docs
Slack
Decisions & threads
Google Workspace
Docs, Sheets, GA
Datadog
Metrics & alerts
Sentry
Error tracking
PagerDuty
Incidents
LaunchDarkly
Feature flags
Linear
2-way ticket sync
Jira
2-way ticket sync
Azure DevOps
Work item sync
Asana
Project & tasks
GitHub
Code & patterns
Figma
Design context
Salesforce
Accounts & deals
HubSpot
CRM & tickets
Zendesk
Support tickets
Intercom
Customer data
Amplitude
Product analytics
PostHog
Analytics & flags
Mixpanel
Funnels & cohorts
Gong
Call transcripts
Granola
Meeting notes
Canny
Feature voting
Productboard
Feature requests
Notion
Docs & wikis
Confluence
Wiki & docs
Slack
Decisions & threads
Google Workspace
Docs, Sheets, GA
Datadog
Metrics & alerts
Sentry
Error tracking
PagerDuty
Incidents
LaunchDarkly
Feature flags
Keep your tools. Add intelligence. Vantage doesn't replace Notion, Linear, or Slack — it connects them.
+ Aha!, Typeform, FullStory, Hotjar, Freshdesk, Monday.com, Trello, Shortcut, and 48 total integrations
What PMs are saying.
I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.
Saved ~10 hrs/week
Tarak Sawant
Product · Quantiphi
Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.
Compliance gaps caught pre-build
Khushboo
Product · Dhan · Fintech
Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.
Cross-project conflicts caught early
Om Pancholi
Product · The Sleep Company
The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.
PRD quality validated
Nikhil
Product · India Today
I spent half my week keeping docs, tickets, and Slack threads in sync after every scope change. With Vantage, scope changes rebuild everything. I review a diff and commit. My week back.
Saved ~10 hrs/week
Tarak Sawant
Product · Quantiphi
Compliance alone would have saved my biggest project this year. Vantage flagged a GDPR gap before we wrote a line of code. I'd pay for this personally even if my org doesn't adopt it.
Compliance gaps caught pre-build
Khushboo
Product · Dhan · Fintech
Conflicts between our parallel products were only discovered after engineering shipped. By then it cost sprints, not hours. Vantage catches that at the requirements stage now.
Cross-project conflicts caught early
Om Pancholi
Product · The Sleep Company
The generated PRD is one of the best I've seen in the business. It's crisp, not too long, to the point and got everything right.
PRD quality validated
Nikhil
Product · India Today
Built for trust.
Enterprise-grade security so you can connect your tools with confidence.
Encrypted in transit
All connections use TLS. Your data is encrypted between your browser, our servers, and our database. Every action is logged.
No model training
We never train on your data. The AI services that process your data are contractually barred from training on it.
Your data, your control
Disconnect any integration or close your account at any time. We remove it from active systems within 30 days.
Pursuing SOC 2 Type II and GDPR compliance. Enterprise security reviews available on request.
Start free. Upgrade when you’re shipping.
Unlimited projects on every plan. AI work runs on credits, so you only pay for what you use.
$0
Try PRDs, journeys and tickets on your real work.
300 credits to start
- Unlimited projects
- PRDs, user journeys and tickets
- Feedback inbox, themes and scoring
- Morning briefing and conflict detection
- Public roadmap, changelog and feedback portal
- Share docs with your team by link
- 2 connected tools
- Prototypes on Pro
- Linear sync on Pro
$19/seat/mo
For the PM shipping every week.
1,500 credits / month
- Everything in Free
- Unlimited questions and documentsfair use
- Prototypes
- Unlimited connected tools
- Linear two-way sync
- Use Vantage from Claude and ChatGPT
- Custom domain, no Vantage branding
- Routines
- 2 viewer seats
$59/seat/mo
For product teams working from one source of truth.
4,000 credits / seat / month
Added up into one team balance: 5 seats = 20,000 a month.
- Everything in Pro, plus:
- Unlimited PRDs, journeys and ticketsfair use
- Unlimited viewers for eng, design and leadership
- Shared workspaces with team memory
- Conflicts caught across teams
- Leader reports on what shipped
- Our most capable AI models and higher-fidelity prototypes
- Priority processing for faster generations
- Roles, admin controls and per-user credit limits
- Dedicated support
Custom
For organizations with several product teams.
Custom credit pool
- Everything in Business
- Multiple organizations
- SSO (Google Workspace / SAML)
- Audit log export
- SLA and security reviews
Free needs no credit card. Paid plans can add 500 credits for $10 at any time.
Stop being the sync layer.
Connect your tools. See what you've been missing by tomorrow morning.